KitLog pro

Powered By Kitlog Pro v2.0

CPT Steve
' style=
Date:  8-15-2009
Number of Hours:  2.50
Manual Reference:  02-1
Brief Description:  WORKED ON VERTICAL STABILIZER

(1) I laid out the balance of the parts for the vertical Stabilizer, and clecoed them together to get a general fit. Drilled stiffeners for rib # 7, and transfer drilled holes on the front spar. again verifying the 71 deg angle. Looks good.
(2) I had primed the front spar and rib #7 before working with the stiffeners
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.